• English
  • Français
Home

Main navigation

  • Home
  • Who We Are
    • About MMEIPA
    • History
    • FAQ
    • Partners
  • Focus Areas
    • Initiatives and Programmes
    • Organisations
  • Resources
    • Other Mapping Portals
    • Download questionnaire
    • Special Reports
  • Statistics
    • Electricity Subsectors
    • Energy Sector Focus
    • Geographical Distribution
    • Modes of Financing
    • Non-Renewable energy sub-sectors
    • Renewable energy subsectors
    • SDG Focus
    • Share of Initiatives per Region
    • Share of Interventions
    • Share of Technical Assistance
    • Trend
  • Contact
  • + Login
  • + Register

Search

 

 

Regional

Initiatives and programmes that are active in more than one country in Africa but do not yet meet the continental scope.

WAPP interconnection-not listed country

Uganda DRC interconnection

Electricity interconnection between inga and calabar -right

Cameroon and chad electricity grid interconnection

Interconnection of the electricity of cameroon, gabon and equtorial guinea

Construction of a micro-hydroelectric power station on the Ogooué River to supply electricity to the Zanaga mining area in the Lékoumou Department

RUVZYIRONZA regional hydroelectric power station

3.6MW regional hydroelectic power plant combined with irrigation of 8 thousand on RUVUBU river

Regional hydroelectric power plant combined with irrigation on the RUVZYIRONZA river

Pagination

  • First page « First
  • Previous page ‹‹
  • Page 1
  • Page 2
  • Page 3
  • Current page 4
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Page 9
  • …
  • Next page ››
  • Last page Last »
Subscribe to Regional

 

Brought to you by:

AEEPAFRECAfDB      AUDA-NEPAD     SE4All Africa Hub

 

 

 

  • English
  • Français
Copyright© 2021: Africa EU Energy Partnership